Central Utah Water Conservancy District

Bid Information

Available Projects

Prequalification of Contractors for CUWCD CWP Wells #14 & #15 Pump House Project -Proposals


NOTICE: The Central Utah Water Conservancy District (“District”) is requesting interested general contractors to submit prequalification proposals to construct the CUWCD CWP Wells #14 & #15 Pump House Project (“Project”). The project will consist of the construction of two drinking water well pump houses, consisting of masonry pump houses with standing seam metal roofs, furnishing and installing 1,000 HP and 450 HP vertical turbine pumps, piping, valving, chlorination equipment, HVAC, surge tank, vaults, electrical, backup power generators, paving, site work, and other associated items. Installation will occur on District property located at 45 West 1600 North, Vineyard, Utah County, Utah.

Prequalification for this project is required by the District. Only prequalified contractors will be allowed to submit a bid. Prequalification proposals must be submitted by interested general contractors to District Headquarters located at 355 West University Parkway, Orem, Utah before 4:00 P.M. on Friday, March 3, 2017.

Spanish Fork Santaquin Pipeline- Tunnel Contractors

November 10, 2016


NOTICE: Statements of Prequalification are being solicited by the Central Utah Water Conservancy District (CUWCD or OWNER) from interested tunnel contractors for jacking tunnel casings up to 84-inch diameter for the Utah Lake Drainage Basin Water Delivery System, Spanish Fork Santaquin Pipeline.

DESCRIPTION OF WORK: The construction work, in general, consists of:

  • Jacking approximately 120 feet of one-inch thick, 72-inch casing under the Union Pacific Railroad adjacent to US Highway 89 near the mouth of Spanish Fork Canyon (Spanish Fork Reach of the Spanish Fork Santaquin Pipeline).
  • Jacking approximately 115 feet of one-inch thick, 72-inch casing under the Union Pacific Railroad adjacent to US Highway 6 near Moark Junction near the mouth of Spanish Fork Canyon (Spanish Fork Reach of the Spanish Fork Santaquin Pipeline).
  • Jacked, tunneled or bore crossings up to 84-inch diameter for other subsequent reaches of the Spanish Fork Santaquin Pipeline across facilities of the Utah Department of Transportation, Union Pacific Railroad, or at other locations.

Prequalification Proposals must be submitted to CUWCD before 4:00pm, Wednesday, December 21, 2016.

Spanish Fork Santaquin Pipeline- General Contractors

November 10, 2016


NOTICE: Statements of Prequalification are being solicited by the Central Utah Water Conservancy District (CUWCD or OWNER) from interested contractors for installing 60-inch welded steel pipe for the Utah Lake Drainage Basin Water Delivery System, Spanish Fork Santaquin Pipeline- Spanish Fork Reach.

DESCRIPTION OF WORK: The construction work for the initial reach of the Spanish Fork Santaquin Pipeline, in general, consists of furnishing and installing the Spanish Fork Santaquin Pipeline Spanish Fork Reach consisting of approximately 8,480 feet of 60-inch steel pipeline, each with welded joints, mortar lining, and tape and mortar coating; approximately 230 feet of 72-inch jacked casings under two Union Pacific railroads, modification of existing concrete structure, asphalt paving, earthwork and other appurtenances and related work.

Prequalification Proposals must be submitted to CUWCD before 4:00pm, Wednesday, December 21, 2016.